FDA warned Cosmetic Science Laboratories about OTC sunscreen drugs made without required manufacturing controls.
What happened
FDA inspected the Torrance, California drug manufacturing facility from September 6 to September 20, 2022, and found failures in identity testing, process validation, batch records, cleaning validation, water monitoring, and quality oversight. FDA also found the firm had not updated its drug establishment registration or met drug listing obligations, and it reviewed the firm’s website on March 7, 2023, which still advertised drug contract manufacturing after the firm said it had ceased drug production.
What FDA found
The firm did not test each incoming active ingredient for identity and relied on suppliers’ test sheets, called certificates of analysis, without validating the suppliers’ test results.
21 CFR 211.84(d)(1) and 211.84(d)(2)The firm lacked adequate written production and process controls, had incomplete batch records, and did not provide process validation or formal studies showing its manufacturing process consistently works.
21 CFR 211.100(a) and 211.188The firm could not show cleaning validation or equipment qualification, used the same equipment for drugs and cosmetics, and lacked cleaning and usage logs for kettles and mixers.
21 CFR parts 210 and 211The firm did not establish that its water system was adequately designed, controlled, maintained, and monitored, and did not show routine microbial testing of the water used in drug products.
21 CFR parts 210 and 211The firm’s quality control unit, its quality oversight group, did not provide adequate oversight, and the firm could not provide documents for test results outside specifications, deviations, investigations, annual product review, or CGMP training.
21 CFR 211.22The firm failed to submit updated establishment registration and failed to meet drug listing obligations, making the drugs misbranded, meaning illegal under the law because not properly listed.
FD&C Act section 510; 21 CFR 207.17 and 207.41
What FDA wants
FDA tells the firm to respond in writing within 15 working days with what it has done to correct the violations and prevent recurrence. It also asks the firm to clarify whether it will resume drug manufacturing, to notify FDA before resuming, and, if it resumes, to engage a qualified CGMP consultant.
Who should pay attention
- brands that buy OTC sunscreen drugs from this contract manufacturer
- contract manufacturers that also make cosmetics on drug equipment